Three related fixes from the test audit.
**The CLI journey fixture gets its own database.** It spawned a real picloud —
whose dispatcher/orchestrator claim loops are global by design (one instance owns
one database) — against the shared dev DB, so it could claim the manager-core
suites' outbox/workflow rows (the same class of bug already fixed for the e2e
suites, one binary over). It now clones one dedicated database per journey run
from the migrated template. test-support gains `named_test_db_url` (explicit
stable name) + a blocking wrapper for the sync `LazyLock` fixture. The one journey
that talks to Postgres directly (dead-letter injection) now uses the fixture's DB
URL, not the base DATABASE_URL, so it hits the database the server reads.
**workflow_orchestrator moves to per-test databases.** Its `claim_ready_step` is
global, so the old harness serialized every test behind a process-wide CLAIM_LOCK
AND ran `DELETE FROM workflow_runs` (unscoped — it wiped every app's runs) before
each one. A private database per test makes the global claim see only that test's
rows, so both the lock and the unscoped DELETE are deleted.
**DB-backed suites fail loud instead of skipping green.** ~15 manager-core suites
`return None` when DATABASE_URL is unset and report PASS — so in any environment
that lost its database the entire integration surface reports green while running
nothing (why the CI gap went unnoticed for so long). New
`picloud_test_support::abort_if_db_required` panics when `PICLOUD_REQUIRE_DB` is
set (CI now sets it) but DATABASE_URL is not, injected into each suite's skip
path. Local runs without the var still skip cleanly.
Mutation-verified: with PICLOUD_REQUIRE_DB=1 and DATABASE_URL unset, a suite
panics; without the var it skips.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
`claim` pre-increments `attempt` before the handler runs, so a real execution
failure legitimately counts toward `max_attempts`. But the two TRANSIENT
release paths — gate saturation (server at capacity) and script-disabled-at-
fire-time — re-queue the message WITHOUT executing it, and previously used the
same `nack` that leaves the pre-increment in place. Under sustained overload a
message could therefore be dead-lettered after N gate-rejections having run
zero times (each rejection burning a retry).
Add a non-counting `release` to both `QueueRepo` and `GroupQueueRepo`
(re-queue + `attempt = GREATEST(attempt - 1, 0)`, mirroring `nack` otherwise)
and route the two transient paths through a new `Dispatcher::q_release`. A real
handler failure still uses `nack` and counts. No schema change.
Pinned by a new `queue_release` DB test (release undoes the claim increment;
nack keeps it) and the updated `disabled_queue_consumer_...` dispatcher test
(now asserts a release, not a nack).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>