Files
PiCloud/docs
MechaCat02 b46667c309 docs: reconcile the groups/project-tool initiative into the roadmap
The groups/project-tool work had no home in the blueprint's version
scheme, two "Phase N" numbering schemes overlapped, and CLAUDE.md's
"current focus" was stale (claimed v1.1.0 SDK foundation; we're at v1.1.9
with the SDK line complete). Reconcile all three:

* blueprint §12 Phase 5 (v1.2, already titled "Advanced Workflows &
  Hierarchies") — split into a Hierarchies track (the groups + project
  tool initiative, with §11 Phases 1–3 marked shipped) and a Workflows
  track, with sequencing flagged as an open call. This gives the work an
  explicit version home: the Hierarchies half of v1.2.
* design doc header — Status Draft → Active, "scheduled as the Hierarchies
  track of v1.2", and an explicit warning that §11's local Phase 1–6
  numbering is distinct from the blueprint product-phase numbering.
* design doc §11.1 — a post-Phase-3 re-sequencing review: resolve Phase 4
  scripts LIVE (drop the fan-out-invalidation sub-project, per the Phase 3
  result); consider a "Phase 5-lite" (declarative apply of vars/secrets +
  app scripts) before the hard group-scripts work; and force the two
  deferred decisions (trigger/route templates vs tenant cardinality;
  multi-repo ownership vs a single-repo start).
* CLAUDE.md — refresh "current focus" to v1.2 Hierarchies, and correct the
  now-broken "every v1.1+ table is app_id NOT NULL" invariant: the new
  group-inheritable config tables (vars, secrets) use a polymorphic owner
  (group_id XOR app_id), not app_id NOT NULL.

Doc-only; no code change.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-25 07:12:25 +02:00
..