Files
Sylpheed/docs
Sylpheed port agent 2bf93916bb port: the two sweep leaves DO run on their own periods -- refutation not landed
The Decoder raised it and could not test it: if the port ran both leaves on one
rate they would stay locked and drift ~118 units per cycle. The leaves declare
600 and 720.

Pre-registered, then measured on a real boot. At raw leaf clock 4873:
  pteff03  span 600 -> measured 72.6  (fposmod 73)
  pteff03a span 720 -> measured 552.6 (fposmod 553)
The port takes each span from that leaf's OWN keyframes, so they were never
locked. 17748 samples, title clock reaching 9745 -- the sweep loops 162 s in.

🔴 Two false alarms of mine on the way, both the same mistake:
 - used --time (which sets frozen and bypasses the holding clamp BY DESIGN) to
   ask about RUNNING behaviour, and nearly reported the whole title vanishing
   past t=250. On a real boot settle_window [160,236,198] clamps to t=198 and a
   filmed frame at view_units 6733 shows the complete title.
 - read a probe going quiet as the feature stopping. Two runs ended at u~236;
   that was the RUN ending, not the sweep. With a film attached the same probe
   reaches 9745.

Both are the frozen-sweep lesson again: the diagnostic that pins the clock cannot
answer a question about the clock running, and an instrument going quiet is not
the subject going quiet -- the same shape as a count of zero meaning only that
nothing reached the reader.
2026-09-03 19:38:37 +00:00
..