Two 0.87.4 follow-ups: 1. Cron tick: existing shutdown-on-cancel test now also asserts the advisory lock is re-acquirable after cancel-during-tick. Without this, a refactor moving `pg_advisory_unlock` under the cancel arm would ship green and break multi-replica safety. 2. Analysis worker: cancel-mid-dispatch left the dashboard banner stuck on the cancelled page until a later page overwrote it. Add a `Cancelled` AnalysisEvent variant, publish on the cancel-release branch, wire the analysis and admin overview dashboards to clear on it. Per-page chip rolls back from `analyzing` to `queued`. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
863 B
863 B